Make a window schedule for several openings

A schedule is one list of the openings in a project. Use it to keep the chosen window and installation details attached to the right room.

Start with labels that make sense on a site visit

Give each opening a short name that a visitor can find, such as upstairs rear or kitchen sink. Label any drawings and photos from the same viewpoint. Write down which pieces open, the frame and glazing choice, the desired finishes and any feature that has been specified by the project professional. Keep options separate from selected items. If two windows look alike but have different glazing or exposure, keep separate rows so the distinction survives any revised quote.

Give unknowns and later decisions their own place

Add columns for who confirms the opening, the work around it and any detail that depends on an inspection. Record the current drawing or quote revision. If you change a model, ask which other details need updating, including the glass values or finish at the wall. Check the final schedule against each quote before ordering and use it to walk through the work at the end. Save the version both sides agreed to.

Keep the labels with the final records

File drawings, labels and care sheets under the same opening names. That makes later questions easier to answer. Add the final product model and glass code before filing.

Put your questions in a project brief

Include the room, the opening and any details you want checked.